Compact Substations · Pad-Mounted Transformers

2500 kVA Three-Phase Pad-Mounted Transformer (ANSI C57.12.20)

Factory-direct 2500 kVA pad-mounted transformer engineered to ANSI C57.12.20 standards, ideal for underground distribution. Benefit from competitive pricing and reliable lead times directly from our ISO-certified Chinese manufacturing facility.

Thông số kỹ thuật

Công suất định mức 2500
Điện áp sơ cấp 34.5 kV primary / 480Y/277 V secondary (customizable)
Điện áp thứ cấp 480Y/277 V, 208Y/120 V
Tuân thủ tiêu chuẩn ANSI C57.12.20, IEEE, NEMA
Cooling Type ONAN
Configuration Dead-front, Loop feed / Radial feed
Vector Group Dyn11 (or as specified)
Frequency 60 Hz (ANSI) / 50 Hz (IEC)
Efficiency Level 99.2%
Impedance (%Z) 5.75%
Cấp cách điện Class A (65°C average temperature rise)
Enclosure Rating NEMA 3R / IP54 Tamper-Resistant Steel Enclosure
Voltage 34.5 kV primary / 480Y/277 V secondary (customizable)
Kva 2500
Tiêu chuẩn ANSI C57.12.20, IEEE, NEMA
Cooling ONAN
Hiệu suất 99.2%
Impedance 5.75%

Thông tin sản phẩm

Trạng thái

Đã xuất bản

Mã sản phẩm

2500KVA_34.5KV_THREE_PHASE_PAD_MOUNTED_TRANSFORMER

Cập nhật lần cuối

2026-08-24 23:55:52

Application Scenarios

  • Commercial centers, solar PV collector substations, EV fast-charging hubs, and industrial parks.

Tính năng

  • Dead-front cabinet design with compartmentalized HV and LV sections for maximum operator safety.
  • Bay-O-Net expulsion fuses with current-limiting backup fuses for robust overcurrent protection.
  • Corrosion-resistant NEMA 3R enclosure with tamper-proof penta-head locking hardware.

Standards

  • 100% Factory Acceptance Testing (FAT) including voltage ratio, dielectric withstand, and winding resistance.

Câu hỏi thường gặp

Manufactured and tested in strict accordance with ANSI C57.12.20, IEEE, NEMA. Certified factory routine test report (FAT) provided with every unit. Third-party inspection (SGS/BV) supported.

Export seaworthy packaging with vacuum moisture barrier, desiccants, and reinforced steel-framed containment. Typical production lead time: 4–6 weeks from drawing approval.

Tiêu chuẩn & Tuân thủ

Manufactured and tested in strict accordance with ANSI C57.12.20, IEEE, NEMA. Certified factory routine test report (FAT) provided with every unit. Third-party inspection (SGS/BV) supported.

Đóng gói, Giao hàng & Dịch vụ

Export seaworthy packaging with vacuum moisture barrier, desiccants, and reinforced steel-framed containment. Typical production lead time: 4–6 weeks from drawing approval.

Sẵn sàng tiến hành?

Yêu cầu báo giá cho 2500 kVA Three-Phase Pad-Mounted...

Chia sẻ phạm vi dự án của bạn và chúng tôi sẽ phản hồi trong vòng 24 giờ.